RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016184 - Archived data from Fri, 05. February 2021 11:28:25 CET


This is all the information about APD 1414016184. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016184
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.7 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 405
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 392.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.0240036 V     T = -25 °C: 356.5235166 V
Voltage for Gain 150: T = +20 °C: 400.9885028 V     T = -25 °C: 364.1835421 V
Voltage for Gain 200: T = +20 °C: 405.4156767 V     T = -25 °C: 368.5002551 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.553774266 V-1     T = -25 °C: 4.568347756 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.920924575 V-1     T = -25 °C: 9.036881384 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.74396946 V-1     T = -25 °C: 15.76075428 V-1
Break-through voltage: T = +20 °C: 421.1357875 V     T = -25 °C: 384.316671 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:13:38 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:40:59 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:28:25 CET jreher Updated box and position via API.
11. Aug 2020 17:58:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:23 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:13 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:19 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:07 CET jreher Updated box and position via API.
10. Nov 2017 09:39:11 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:00:58 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:57:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:35 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:54 CEST Tobias Imported from Hamamatsu datasheet.