RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016166 - Archived data from Thu, 19. December 2019 16:48:02 CET


This is all the information about APD 1414016166. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016166
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 389.6 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 309
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 405
Position in grid: 2
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 389.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:22 CET jreher Updated box and position via API.
11. Aug 2020 17:58:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:02 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:02 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:03 CET jreher Updated box and position via API.
10. Nov 2017 09:39:11 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:00:58 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:57:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:34 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:50 CEST Tobias Imported from Hamamatsu datasheet.