RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016127 - Archived data from Tue, 11. August 2020 17:58:42 CEST


This is all the information about APD 1414016127. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016127
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.4 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 309
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 403
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 392.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.7367733 V     T = -25 °C: 356.4233451 V
Voltage for Gain 150: T = +20 °C: 400.6545249 V     T = -25 °C: 364.0410627 V
Voltage for Gain 200: T = +20 °C: 405.031983 V     T = -25 °C: 368.3309264 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.376376602 V-1     T = -25 °C: 4.64663737 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.321455839 V-1     T = -25 °C: 9.248808776 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57578761 V-1     T = -25 °C: 14.31978518 V-1
Break-through voltage: T = +20 °C: 420.6133894 V     T = -25 °C: 384.2066518 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:20 CET jreher Updated box and position via API.
11. Aug 2020 17:58:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:00 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:00 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:02 CET jreher Updated box and position via API.
20. Oct 2017 14:31:54 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:51:22 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:33:00 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:33 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:48 CEST Tobias Imported from Hamamatsu datasheet.