RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016123 - Archived data from Fri, 05. February 2021 11:28:20 CET


This is all the information about APD 1414016123. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016123
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.1 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 309
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 403
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 392.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.2382131 V     T = -25 °C: 356.0224394 V
Voltage for Gain 150: T = +20 °C: 400.1841871 V     T = -25 °C: 363.6193452 V
Voltage for Gain 200: T = +20 °C: 404.6017102 V     T = -25 °C: 367.8680423 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466382554 V-1     T = -25 °C: 4.801857365 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.773943943 V-1     T = -25 °C: 8.736637799 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29211497 V-1     T = -25 °C: 15.20368033 V-1
Break-through voltage: T = +20 °C: 420.3301964 V     T = -25 °C: 383.7391765 V
   
Notes:


Version history

Time Author Change comment
27. Sep 2021 16:13:16 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:47 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:20 CET jreher Updated box and position via API.
11. Aug 2020 17:58:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:00 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:00 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:01 CET jreher Updated box and position via API.
20. Oct 2017 14:31:54 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:51:22 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:33:00 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:33 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:48 CEST Tobias Imported from Hamamatsu datasheet.