RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1414016121 - Archived data from Wed, 01. December 2021 12:56:47 CET


This is all the information about APD 1414016121. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016121
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.9 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 32
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 402
Position in grid: 18
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.3232701 V     T = -25 °C: 355.1137731 V
Voltage for Gain 150: T = +20 °C: 399.3142162 V     T = -25 °C: 362.7790504 V
Voltage for Gain 200: T = +20 °C: 403.7063623 V     T = -25 °C: 367.0813013 V
Gain/Voltage slope at M = 100: T = +20 °C: 3.938476051 V-1     T = -25 °C: 4.57446285 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.102947707 V-1     T = -25 °C: 10.13900697 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36485681 V-1     T = -25 °C: 14.2700096 V-1
Break-through voltage: T = +20 °C: 419.2314399 V     T = -25 °C: 382.8503842 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:57:43 CET oafedulidis Assigned to capsule by script
01. Dec 2021 12:56:47 CET oafedulidis Updated box and position via API.
05. Feb 2021 10:51:57 CET jreher Updated box and position via API.
03. Feb 2021 18:18:03 CET jreher Updated box and position via API.
11. Aug 2020 17:24:50 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:14 CET jreher Updated APD location via API.
25. Nov 2019 17:13:22 CET jreher Updated box and position via API.
13. Jun 2019 11:28:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:41 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 12:46:51 CET markus.moritz
29. Sep 2017 13:38:09 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:32 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:48 CEST Tobias Imported from Hamamatsu datasheet.