Show Hamamatsu Avalanche Photo Diode 1414016117 - Archived data from Tue, 11. August 2020 17:24:49 CEST


This is all the information about APD 1414016117. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1414016117
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.8 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 32
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 402
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.8717274 V     T = -25 °C: 358.3548712 V
Voltage for Gain 150: T = +20 °C: 402.7869121 V     T = -25 °C: 366.0515737 V
Voltage for Gain 200: T = +20 °C: 407.2120423 V     T = -25 °C: 370.4302125 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.384419806 V-1     T = -25 °C: 4.501487936 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.276398518 V-1     T = -25 °C: 8.745739079 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.93232295 V-1     T = -25 °C: 15.95699339 V-1
Break-through voltage: T = +20 °C: 422.8109794 V     T = -25 °C: 386.3279828 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:57 CET jreher Updated box and position via API.
03. Feb 2021 18:18:03 CET jreher Updated box and position via API.
11. Aug 2020 17:24:49 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:13 CET jreher Updated APD location via API.
25. Nov 2019 17:13:22 CET jreher Updated box and position via API.
13. Jun 2019 11:28:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:40 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 12:45:57 CET markus.moritz
29. Sep 2017 13:38:09 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:32 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:48 CEST Tobias Imported from Hamamatsu datasheet.