RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1413016079 - Archived data from Wed, 03. February 2021 18:19:14 CET


This is all the information about APD 1413016079. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1413016079
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 41
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 401
Position in grid: 15
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6586191 V     T = -25 °C: 348.7970864 V
Voltage for Gain 150: T = +20 °C: 392.648682 V     T = -25 °C: 356.3109301 V
Voltage for Gain 200: T = +20 °C: 397.0824296 V     T = -25 °C: 360.5416273 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453532391 V-1     T = -25 °C: 4.73443052 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.449155739 V-1     T = -25 °C: 9.212362587 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03710441 V-1     T = -25 °C: 15.58367646 V-1
Break-through voltage: T = +20 °C: 411.361529 V     T = -25 °C: 375.2050201 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:28 CET jreher Updated box and position via API.
03. Feb 2021 18:19:14 CET jreher Updated box and position via API.
11. Aug 2020 17:26:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:14 CET jreher Updated APD location via API.
25. Nov 2019 17:14:07 CET jreher Updated box and position via API.
04. Jul 2019 11:11:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:22 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 15:07:38 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:25:46 CET markus.moritz
29. Sep 2017 12:30:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:32 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:47 CEST Tobias Imported from Hamamatsu datasheet.