RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1413016068 - Archived data from Wed, 03. February 2021 18:19:11 CET


This is all the information about APD 1413016068. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1413016068
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 395 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 40
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 401
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.3357706 V     T = -25 °C: 358.7167305 V
Voltage for Gain 150: T = +20 °C: 403.3129363 V     T = -25 °C: 366.4396345 V
Voltage for Gain 200: T = +20 °C: 407.752425 V     T = -25 °C: 370.79243 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.623009463 V-1     T = -25 °C: 4.692786773 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92624589 V-1     T = -25 °C: 9.016334668 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18371445 V-1     T = -25 °C: 15.23303638 V-1
Break-through voltage: T = +20 °C: 423.3215495 V     T = -25 °C: 386.6503637 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:25 CET jreher Updated box and position via API.
03. Feb 2021 18:19:11 CET jreher Updated box and position via API.
11. Aug 2020 17:26:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:06 CET jreher Updated APD location via API.
25. Nov 2019 17:14:05 CET jreher Updated box and position via API.
04. Jul 2019 11:11:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:22 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 15:07:38 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:30:08 CET markus.moritz
29. Sep 2017 12:30:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:31 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:47 CEST Tobias Imported from Hamamatsu datasheet.