RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1413016053 - Archived data from Tue, 11. August 2020 17:26:26 CEST


This is all the information about APD 1413016053. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1413016053
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1413016053/2306024610
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.8 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 41
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 400
Position in grid: 9
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.6755714 V     T = -25 °C: 356.3988577 V
Voltage for Gain 150: T = +20 °C: 400.7137659 V     T = -25 °C: 364.101802 V
Voltage for Gain 200: T = +20 °C: 405.1750252 V     T = -25 °C: 368.3870569 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.188663397 V-1     T = -25 °C: 4.532695806 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.965037482 V-1     T = -25 °C: 9.692177447 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08367006 V-1     T = -25 °C: 15.60078855 V-1
Break-through voltage: T = +20 °C: 420.2073849 V     T = -25 °C: 383.6875896 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:32 CET jreher Updated box and position via API.
03. Feb 2021 18:19:19 CET jreher Updated box and position via API.
11. Aug 2020 17:26:26 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:32 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:11 CET jreher Updated box and position via API.
27. Nov 2019 19:36:17 CET jreher Updated APD location via API.
25. Nov 2019 17:14:12 CET jreher Updated box and position via API.
04. Jul 2019 11:11:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:26 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:11:28 CET markus.moritz
29. Sep 2017 11:19:46 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:31 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:47 CEST Tobias Imported from Hamamatsu datasheet.