RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015990 - Archived data from Wed, 03. February 2021 18:19:17 CET


This is all the information about APD 1412015990. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015990
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 396 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 41
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 397
Position in grid: 13
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 396.3341587 V     T = -25 °C: 359.6535545 V
Voltage for Gain 150: T = +20 °C: 404.2405868 V     T = -25 °C: 367.3952112 V
Voltage for Gain 200: T = +20 °C: 408.661502 V     T = -25 °C: 371.7344983 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405658303 V-1     T = -25 °C: 4.753395918 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.695034284 V-1     T = -25 °C: 8.553713702 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26016262 V-1     T = -25 °C: 14.26057339 V-1
Break-through voltage: T = +20 °C: 424.0757685 V     T = -25 °C: 387.5558683 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:30 CET jreher Updated box and position via API.
03. Feb 2021 18:19:17 CET jreher Updated box and position via API.
11. Aug 2020 17:26:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:16 CET jreher Updated APD location via API.
25. Nov 2019 17:14:10 CET jreher Updated box and position via API.
04. Jul 2019 11:11:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:25 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:35:11 CET markus.moritz
29. Sep 2017 13:50:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:30 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:45 CEST Tobias Imported from Hamamatsu datasheet.