RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015984 - Archived data from Tue, 11. August 2020 17:26:22 CEST


This is all the information about APD 1412015984. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015984
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.6 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 41
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 397
Position in grid: 7
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.6465079 V     T = -25 °C: 357.2394881 V
Voltage for Gain 150: T = +20 °C: 401.5593311 V     T = -25 °C: 364.9161566 V
Voltage for Gain 200: T = +20 °C: 405.9475636 V     T = -25 °C: 369.2518598 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.592940921 V-1     T = -25 °C: 4.415607682 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.2236437 V-1     T = -25 °C: 9.430661548 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61742057 V-1     T = -25 °C: 15.94925281 V-1
Break-through voltage: T = +20 °C: 419.0123363 V     T = -25 °C: 384.1168715 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:30 CET jreher Updated box and position via API.
03. Feb 2021 18:19:16 CET jreher Updated box and position via API.
11. Aug 2020 17:26:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:15 CET jreher Updated APD location via API.
25. Nov 2019 17:14:10 CET jreher Updated box and position via API.
04. Jul 2019 11:11:11 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:24 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:38:37 CET markus.moritz
29. Sep 2017 13:50:06 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:30 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:45 CEST Tobias Imported from Hamamatsu datasheet.