RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1412015962 - Archived data from Wed, 16. June 2021 15:51:58 CEST


This is all the information about APD 1412015962. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1412015962
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 37
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 396
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.6748857 V     T = -25 °C: 358.0872615 V
Voltage for Gain 150: T = +20 °C: 402.6360572 V     T = -25 °C: 365.7940845 V
Voltage for Gain 200: T = +20 °C: 407.0588919 V     T = -25 °C: 370.1221939 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.496225776 V-1     T = -25 °C: 4.556675136 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.641971643 V-1     T = -25 °C: 8.712914526 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44425869 V-1     T = -25 °C: 14.65710137 V-1
Break-through voltage: T = +20 °C: 422.585862 V     T = -25 °C: 385.6309942 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:06:17 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:56 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:19 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:52:48 CET jreher Updated box and position via API.
03. Feb 2021 18:18:43 CET jreher Updated box and position via API.
11. Aug 2020 17:25:42 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:23:11 CET jreher Updated APD location via API.
25. Nov 2019 17:13:48 CET jreher Updated box and position via API.
13. Jun 2019 11:29:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:05 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:34:42 CET markus.moritz Entered shipped after irradiation date.
03. Jan 2019 14:34:27 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:45:28 CET markus.moritz
29. Sep 2017 12:31:12 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:29 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:44 CEST Tobias Imported from Hamamatsu datasheet.