RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1411015908 - Archived data from Tue, 11. August 2020 17:57:12 CEST


This is all the information about APD 1411015908. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1411015908
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 394
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 388.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.2598805 V     T = -25 °C: 354.1744573 V
Voltage for Gain 150: T = +20 °C: 397.115078 V     T = -25 °C: 361.7583631 V
Voltage for Gain 200: T = +20 °C: 401.4934772 V     T = -25 °C: 365.8467337 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.493662402 V-1     T = -25 °C: 7.648250661 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.937673649 V-1     T = -25 °C: 10.02790245 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.80002577 V-1     T = -25 °C: 18.93290722 V-1
Break-through voltage: T = +20 °C: 414.2394927 V     T = -25 °C: 380.5698484 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:01 CET jreher Updated box and position via API.
11. Aug 2020 17:57:12 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:46 CEST jreher Updated box and position via API.
19. Dec 2019 15:53:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:51 CET jreher Updated box and position via API.
20. Oct 2017 14:31:45 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:56:51 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:37:38 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:27 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:43 CEST Tobias Imported from Hamamatsu datasheet.