RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1411015879 - Archived data from Wed, 03. February 2021 18:18:51 CET


This is all the information about APD 1411015879. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1411015879
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 38
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 392
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3816913 V     T = -25 °C: 352.3179454 V
Voltage for Gain 150: T = +20 °C: 396.2680336 V     T = -25 °C: 359.8459036 V
Voltage for Gain 200: T = +20 °C: 400.6369438 V     T = -25 °C: 364.0721645 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.431768138 V-1     T = -25 °C: 4.595751764 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.237846523 V-1     T = -25 °C: 9.700339895 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78938333 V-1     T = -25 °C: 15.7855734 V-1
Break-through voltage: T = +20 °C: 413.9235887 V     T = -25 °C: 377.8307924 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:06 CET jreher Updated box and position via API.
03. Feb 2021 18:18:51 CET jreher Updated box and position via API.
11. Aug 2020 17:25:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:35:42 CET jreher Updated APD location via API.
25. Nov 2019 17:13:54 CET jreher Updated box and position via API.
04. Jul 2019 11:10:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:10 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:24:55 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:37:04 CET markus.moritz
29. Sep 2017 13:37:44 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:26 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:42 CEST Tobias Imported from Hamamatsu datasheet.