RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005333 - Archived data from Wed, 07. October 2020 15:46:02 CEST


This is all the information about APD 0617005333. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005333
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 423.6 V
Dark current: 16.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 43
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.5487207 V     T = -25 °C: 386.7331044 V
Voltage for Gain 150: T = +20 °C: 431.3864951 V     T = -25 °C: 394.5596499 V
Voltage for Gain 200: T = +20 °C: 435.7339361 V     T = -25 °C: 398.8893564 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.639186292 V-1     T = -25 °C: 4.561401305 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.046907359 V-1     T = -25 °C: 8.879270081 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.48006526 V-1     T = -25 °C: 15.19567239 V-1
Break-through voltage: T = +20 °C: 440.0153034 V     T = -25 °C: 413.7767005 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:46 CET jreher Updated box and position via API.
03. Feb 2021 18:19:33 CET jreher Updated box and position via API.
07. Oct 2020 15:46:02 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:38 CET jreher Updated APD location via API.
25. Nov 2019 17:14:20 CET jreher Updated box and position via API.
04. Jul 2019 11:11:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:34 CEST jreher Updated APD batch assignment via API.
28. Apr 2014 15:40:36 CEST Tobias Imported from Hamamatsu datasheet.