RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1410015797 - Archived data from Tue, 11. August 2020 17:24:45 CEST


This is all the information about APD 1410015797. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1410015797
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 429 V
Voltage for Gain 100 (T=+25°C): 401 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 31
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 389
Position in grid: 2
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 400.7454116 V     T = -25 °C: 363.8620512 V
Voltage for Gain 150: T = +20 °C: 408.6775442 V     T = -25 °C: 371.6902828 V
Voltage for Gain 200: T = +20 °C: 413.0304459 V     T = -25 °C: 376.0411841 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615101383 V-1     T = -25 °C: 4.602122183 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.074111226 V-1     T = -25 °C: 9.22652515 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79757769 V-1     T = -25 °C: 14.34091084 V-1
Break-through voltage: T = +20 °C: 428.1970419 V     T = -25 °C: 391.706962 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:53 CET jreher Updated box and position via API.
03. Feb 2021 18:17:58 CET jreher Updated box and position via API.
11. Aug 2020 17:24:45 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:04 CET jreher Updated APD location via API.
25. Nov 2019 17:13:20 CET jreher Updated box and position via API.
13. Jun 2019 11:28:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:39 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:31:36 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:25:58 CET markus.moritz
29. Sep 2017 11:20:23 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:46 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:41 CEST Tobias Imported from Hamamatsu datasheet.