RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1409015754 - Archived data from Wed, 03. February 2021 18:17:48 CET


This is all the information about APD 1409015754. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1409015754
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 395 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 30
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 387
Position in grid: 10
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.8299929 V     T = -25 °C: 358.1958338 V
Voltage for Gain 150: T = +20 °C: 402.8148026 V     T = -25 °C: 365.9107684 V
Voltage for Gain 200: T = +20 °C: 407.268447 V     T = -25 °C: 370.2559094 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.354080464 V-1     T = -25 °C: 4.641291381 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.824153195 V-1     T = -25 °C: 8.675082249 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83253615 V-1     T = -25 °C: 15.22236108 V-1
Break-through voltage: T = +20 °C: 421.7680061 V     T = -25 °C: 384.835425 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:42 CET jreher Updated box and position via API.
03. Feb 2021 18:17:48 CET jreher Updated box and position via API.
11. Aug 2020 17:24:32 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:21:51 CET jreher Updated APD location via API.
25. Nov 2019 17:13:13 CET jreher Updated box and position via API.
13. Jun 2019 11:19:38 CEST jreher Updated APD location via API.
13. Jun 2019 11:19:01 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:32 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:33:54 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 12:42:44 CET markus.moritz
29. Sep 2017 12:04:26 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:23 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:31 CEST Tobias Imported from Hamamatsu datasheet.