RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1409015739 - Archived data from Tue, 11. August 2020 17:58:19 CEST


This is all the information about APD 1409015739. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1409015739
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.1 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 386
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 394.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.002136 V     T = -25 °C: 358.4651994 V
Voltage for Gain 150: T = +20 °C: 402.8989032 V     T = -25 °C: 366.0765218 V
Voltage for Gain 200: T = +20 °C: 407.2767621 V     T = -25 °C: 370.3483909 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578178771 V-1     T = -25 °C: 4.645381175 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.090333305 V-1     T = -25 °C: 9.181648098 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13423887 V-1     T = -25 °C: 14.29443648 V-1
Break-through voltage: T = +20 °C: 422.2858318 V     T = -25 °C: 385.443593 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:02 CET jreher Updated box and position via API.
11. Aug 2020 17:58:19 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:29 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:43 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:44 CET jreher Updated box and position via API.
10. Nov 2017 09:39:01 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:01:55 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:46:59 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:23 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:31 CEST Tobias Imported from Hamamatsu datasheet.