RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1409015725 - Archived data from Tue, 11. August 2020 17:58:18 CEST


This is all the information about APD 1409015725. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1409015725
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 394.7 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 386
Position in grid: 7
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 394.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.6224462 V     T = -25 °C: 358.5850931 V
Voltage for Gain 150: T = +20 °C: 402.53064 V     T = -25 °C: 366.1965701 V
Voltage for Gain 200: T = +20 °C: 406.9078105 V     T = -25 °C: 370.4716956 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.361753666 V-1     T = -25 °C: 4.60821503 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.500485751 V-1     T = -25 °C: 9.10185472 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74823683 V-1     T = -25 °C: 14.13067654 V-1
Break-through voltage: T = +20 °C: 421.974086 V     T = -25 °C: 385.6742617 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:00 CET jreher Updated box and position via API.
11. Aug 2020 17:58:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:28 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:43 CET jreher Updated box and position via API.
10. Nov 2017 09:39:01 CET markus.moritz Entered shipped after irradiation date.
09. Nov 2017 15:01:55 CET markus.moritz Entered irradiation information.
29. Sep 2017 11:46:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:22 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:30 CEST Tobias Imported from Hamamatsu datasheet.