Show Hamamatsu Avalanche Photo Diode 1409015723 - Archived data from Tue, 11. August 2020 17:58:17 CEST
This is all the information about APD 1409015723. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1409015723 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E07 |
Break-through voltage: | 417 V |
Voltage for Gain 100 (T=+25°C): | 388 V |
Dark current: | 4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 306 |
Position in Box: | 49 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 386 |
Position in grid: | 5 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 10. Nov 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 08. Nov 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 1 |
Bias voltage: | 388 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 388.4673076 V T = -25 °C: 352.5479576 V |
Voltage for Gain 150: | T = +20 °C: 396.4100558 V T = -25 °C: 360.0392051 V |
Voltage for Gain 200: | T = +20 °C: 400.8156376 V T = -25 °C: 364.2667197 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.420248435 V-1 T = -25 °C: 4.662975939 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.570410061 V-1 T = -25 °C: 9.374287652 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.79385074 V-1 T = -25 °C: 14.5683395 V-1 |
Break-through voltage: | T = +20 °C: 416.6893347 V T = -25 °C: 379.9954018 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:27:56 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:58:17 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:44:27 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:44:18 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:35:06 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:39 CET | jreher | Updated box and position via API. |
10. Nov 2017 09:39:01 CET | markus.moritz | Entered shipped after irradiation date. |
09. Nov 2017 15:01:55 CET | markus.moritz | Entered irradiation information. |
29. Sep 2017 11:46:58 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:22 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:32:30 CEST | Tobias | Imported from Hamamatsu datasheet. |