RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1407015614 - Archived data from Tue, 11. August 2020 17:24:28 CEST


This is all the information about APD 1407015614. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1407015614
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 29
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 380
Position in grid: 15
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.3590449 V     T = -25 °C: 353.5586435 V
Voltage for Gain 150: T = +20 °C: 397.2764926 V     T = -25 °C: 361.1314101 V
Voltage for Gain 200: T = +20 °C: 401.68646 V     T = -25 °C: 365.3692331 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.005351624 V-1     T = -25 °C: 3.946511669 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.157193525 V-1     T = -25 °C: 8.879213777 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.60933289 V-1     T = -25 °C: 14.53697808 V-1
Break-through voltage: T = +20 °C: 416.8061297 V     T = -25 °C: 380.5398472 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:37 CET jreher Updated box and position via API.
03. Feb 2021 18:17:43 CET jreher Updated box and position via API.
11. Aug 2020 17:24:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:40 CET jreher Updated APD location via API.
25. Nov 2019 17:13:11 CET jreher Updated box and position via API.
04. Jul 2019 11:10:11 CEST jreher Updated APD location via API.
17. Jun 2019 11:27:42 CEST jreher Updated APD location via API.
13. Jun 2019 11:28:14 CEST jreher Updated APD location via API.
13. Jun 2019 11:07:32 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:30 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:30:55 CET markus.moritz
03. Dec 2018 14:17:43 CET markus.moritz
29. Sep 2017 12:04:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:18 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:27 CEST Tobias Imported from Hamamatsu datasheet.