RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1407015574 - Archived data from Thu, 26. October 2017 16:30:42 CEST


This is all the information about APD 1407015574. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1407015574
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 391.3 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 306
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 378
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 391.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:29:27 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:10:49 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:54 CET jreher Updated box and position via API.
11. Aug 2020 17:58:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:17 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:06 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:39 CET jreher Updated box and position via API.
27. Oct 2017 10:37:31 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:30:42 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:43:47 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:17 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:25 CEST Tobias Imported from Hamamatsu datasheet.