RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1407015568 - Archived data from Fri, 05. February 2021 11:27:52 CET


This is all the information about APD 1407015568. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1407015568
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 390.3 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 306
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 378
Position in grid: 11
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 390.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.4725543 V     T = -25 °C: 353.5415909 V
Voltage for Gain 150: T = +20 °C: 397.4622545 V     T = -25 °C: 361.1427065 V
Voltage for Gain 200: T = +20 °C: 401.8901501 V     T = -25 °C: 365.4270625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.3590092 V-1     T = -25 °C: 4.59020178 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.417903154 V-1     T = -25 °C: 9.022578355 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47623819 V-1     T = -25 °C: 15.91879081 V-1
Break-through voltage: T = +20 °C: 416.1977829 V     T = -25 °C: 379.9105591 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:00:13 CET oafedulidis Assigned to capsule by script
05. Feb 2021 11:27:52 CET jreher Updated box and position via API.
11. Aug 2020 17:58:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:17 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:06 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:38 CET jreher Updated box and position via API.
27. Oct 2017 10:37:31 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:30:41 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:43:47 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:17 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:25 CEST Tobias Imported from Hamamatsu datasheet.