RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1407015563 - Archived data from Fri, 27. August 2021 11:14:51 CEST


This is all the information about APD 1407015563. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1407015563
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 393.3 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 306
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 378
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 393.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.525543 V     T = -25 °C: 357.1852844 V
Voltage for Gain 150: T = +20 °C: 401.4692402 V     T = -25 °C: 364.859752 V
Voltage for Gain 200: T = +20 °C: 405.8668889 V     T = -25 °C: 369.1778149 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.342325849 V-1     T = -25 °C: 4.628159994 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.212307158 V-1     T = -25 °C: 9.134719955 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3746323 V-1     T = -25 °C: 14.11687213 V-1
Break-through voltage: T = +20 °C: 420.9565736 V     T = -25 °C: 384.6471646 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:50 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:52 CET jreher Updated box and position via API.
11. Aug 2020 17:58:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:05 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:38 CET jreher Updated box and position via API.
27. Oct 2017 10:37:31 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:30:41 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:43:47 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:17 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:25 CEST Tobias Imported from Hamamatsu datasheet.