RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1406015531 - Archived data from Tue, 11. August 2020 17:24:22 CEST


This is all the information about APD 1406015531. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1406015531
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.1 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 29
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 377
Position in grid: 1
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.4388903 V     T = -25 °C: 354.2378038 V
Voltage for Gain 150: T = +20 °C: 398.3449043 V     T = -25 °C: 361.8612554 V
Voltage for Gain 200: T = +20 °C: 402.779812 V     T = -25 °C: 366.1323318 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526613907 V-1     T = -25 °C: 4.905073962 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.703718921 V-1     T = -25 °C: 8.843218719 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01121162 V-1     T = -25 °C: 14.78379 V-1
Break-through voltage: T = +20 °C: 418.4731346 V     T = -25 °C: 381.8795533 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:33 CET jreher Updated box and position via API.
03. Feb 2021 18:17:40 CET jreher Updated box and position via API.
11. Aug 2020 17:24:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:37 CET jreher Updated APD location via API.
25. Nov 2019 17:13:09 CET jreher Updated box and position via API.
04. Jul 2019 11:10:09 CEST jreher Updated APD location via API.
17. Jun 2019 11:27:40 CEST jreher Updated APD location via API.
13. Jun 2019 11:28:12 CEST jreher Updated APD location via API.
13. Jun 2019 11:07:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:28 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 08:55:39 CET markus.moritz
03. Dec 2018 11:02:18 CET markus.moritz
29. Sep 2017 11:21:29 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:16 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:32:24 CEST Tobias Imported from Hamamatsu datasheet.