Show Hamamatsu Avalanche Photo Diode 1406015527 - Archived data from Wed, 03. February 2021 18:19:15 CET
This is all the information about APD 1406015527. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1406015527 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E04 |
Break-through voltage: | 420 V |
Voltage for Gain 100 (T=+25°C): | 391.7 V |
Dark current: | 6.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 41 |
Position in Box: | 15 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 376 |
Position in grid: | 17 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 392.3511166 V T = -25 °C: 355.9086226 V |
Voltage for Gain 150: | T = +20 °C: 400.3013673 V T = -25 °C: 363.5599693 V |
Voltage for Gain 200: | T = +20 °C: 404.6984725 V T = -25 °C: 367.8547776 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.389727229 V-1 T = -25 °C: 4.565808764 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.707206964 V-1 T = -25 °C: 9.455017489 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.67075961 V-1 T = -25 °C: 14.62684672 V-1 |
Break-through voltage: | T = +20 °C: 420.0937803 V T = -25 °C: 383.2622837 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
27. Sep 2021 16:13:07 CEST | oafedulidis | Assigned to capsule by script |
17. May 2021 09:17:45 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:53:29 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:15 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:26:21 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:36:15 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:14:09 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:11:10 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:48:28 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:33:24 CEST | jreher | Updated APD batch assignment via API. |
26. Nov 2018 14:27:57 CET | markus.moritz | |
29. Sep 2017 13:35:59 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:16 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:32:24 CEST | Tobias | Imported from Hamamatsu datasheet. |