RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005303 - Archived data from Tue, 11. August 2020 17:27:03 CEST


This is all the information about APD 0617005303. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005303
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 453 V
Voltage for Gain 100 (T=+25°C): 425.6 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 45
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 425.4675964 V     T = -25 °C: 388.589183 V
Voltage for Gain 150: T = +20 °C: 433.3204309 V     T = -25 °C: 396.4239502 V
Voltage for Gain 200: T = +20 °C: 437.6811285 V     T = -25 °C: 400.7767023 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.645196025 V-1     T = -25 °C: 4.613059076 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.113260218 V-1     T = -25 °C: 9.06048403 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.89594855 V-1     T = -25 °C: 15.5474366 V-1
Break-through voltage: T = +20 °C: 439.9918934 V     T = -25 °C: 415.0040306 V
   
Notes: foam, Markus Moritz sent a picture on 2018-08-15 that shows cracks on the front surface of this APD.

The pictures are available here:
/nfs/data/jollyj/tobias/productiondb/images/APD0617005303_cracks_2018-08-15_1.jpg
/nfs/data/jollyj/tobias/productiondb/images/APD0617005303_cracks_2018-08-15_2.jpg


Version history

Time Author Change comment
05. Feb 2021 10:53:59 CET jreher Updated box and position via API.
03. Feb 2021 18:19:46 CET jreher Updated box and position via API.
07. Oct 2020 15:46:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:03 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:00 CET jreher Updated APD location via API.
25. Nov 2019 17:14:30 CET jreher Updated box and position via API.
04. Jul 2019 11:11:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:38 CEST jreher Updated APD batch assignment via API.
21. Aug 2018 11:20:32 CEST markus.moritz
16. Aug 2018 12:03:56 CEST tobias Added path to picture files to the notes.
15. Aug 2018 11:42:19 CEST tobias Added note about cracks on the surface.
28. Apr 2014 15:40:36 CEST Tobias Imported from Hamamatsu datasheet.