RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005301 - Archived data from Tue, 11. August 2020 17:26:40 CEST


This is all the information about APD 0617005301. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005301
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 456 V
Voltage for Gain 100 (T=+25°C): 428.1 V
Dark current: 15.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 43
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 428.7465702 V     T = -25 °C: 391.7085458 V
Voltage for Gain 150: T = +20 °C: 436.6667266 V     T = -25 °C: 399.5896346 V
Voltage for Gain 200: T = +20 °C: 438.800605 V     T = -25 °C: 403.9690806 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515705167 V-1     T = -25 °C: 4.532786951 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.697203208 V-1     T = -25 °C: 8.748327708 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 10.58749596 V-1     T = -25 °C: 14.86181378 V-1
Break-through voltage: T = +20 °C: 440.0116342 V     T = -25 °C: 415.0147393 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:45 CET jreher Updated box and position via API.
03. Feb 2021 18:19:32 CET jreher Updated box and position via API.
07. Oct 2020 15:46:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:40 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:37 CET jreher Updated APD location via API.
25. Nov 2019 17:14:20 CET jreher Updated box and position via API.
04. Jul 2019 11:11:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:33 CEST jreher Updated APD batch assignment via API.
28. Apr 2014 15:40:36 CEST Tobias Imported from Hamamatsu datasheet.