Show Hamamatsu Avalanche Photo Diode 1405015432 - Archived data from Fri, 16. April 2021 22:01:03 CEST
This is all the information about APD 1405015432. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1405015432 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C08 |
Break-through voltage: | 418 V |
Voltage for Gain 100 (T=+25°C): | 389.1 V |
Dark current: | 5.1 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 357 |
Position in Box: | 4 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 372 |
Position in grid: | 9 |
Arrival for irradiation: | 20. Dec 2016 |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 389.6534454 V T = -25 °C: 353.8774431 V |
Voltage for Gain 150: | T = +20 °C: 397.6380555 V T = -25 °C: 361.3852912 V |
Voltage for Gain 200: | T = +20 °C: 402.0668426 V T = -25 °C: 365.5943823 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.586740844 V-1 T = -25 °C: 4.830996502 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.124110275 V-1 T = -25 °C: 8.92642252 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.07346479 V-1 T = -25 °C: 15.71312632 V-1 |
Break-through voltage: | T = +20 °C: 417.4507688 V T = -25 °C: 380.5203021 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 14:45:20 CEST | oafedulidis | Updated box and position via API. |
16. Apr 2021 22:01:03 CEST | jreher | Updated APD characteristics via API. |
05. Feb 2021 11:34:03 CET | jreher | Updated box and position via API. |
08. Oct 2020 18:15:33 CEST | jreher | Updated APD location via API. |
17. Sep 2020 14:26:28 CEST | vwerner | Updated APD batch assignment via API. |
17. Aug 2020 14:32:03 CEST | vwerner | Updated APD batch assignment via API. |
20. Dec 2016 10:26:16 CET | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:13 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:32:22 CEST | Tobias | Imported from Hamamatsu datasheet. |