Show Hamamatsu Avalanche Photo Diode 1405015425 - Archived data from Fri, 16. April 2021 22:00:07 CEST
This is all the information about APD 1405015425. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1405015425 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D07 |
Break-through voltage: | 416 V |
Voltage for Gain 100 (T=+25°C): | 386.8 V |
Dark current: | 4.9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 348 |
Position in Box: | 20 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 372 |
Position in grid: | 2 |
Arrival for irradiation: | 20. Dec 2016 |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 387.3590357 V T = -25 °C: 351.1746426 V |
Voltage for Gain 150: | T = +20 °C: 395.3033905 V T = -25 °C: 358.7043151 V |
Voltage for Gain 200: | T = +20 °C: 399.7067688 V T = -25 °C: 362.923319 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.44798683 V-1 T = -25 °C: 4.761586525 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.605870443 V-1 T = -25 °C: 9.596358855 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.91353698 V-1 T = -25 °C: 15.10110315 V-1 |
Break-through voltage: | T = +20 °C: 415.3758763 V T = -25 °C: 378.6417586 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
15. Nov 2022 12:53:16 CET | oafedulidis | Assigned to capsule by script |
16. Apr 2021 22:00:07 CEST | jreher | Updated APD characteristics via API. |
15. Apr 2021 17:00:56 CEST | jreher | Updated box and position via API. |
05. Feb 2021 11:32:56 CET | jreher | Updated box and position via API. |
17. Aug 2020 14:03:37 CEST | vwerner | Updated APD batch assignment via API. |
11. Aug 2020 17:54:36 CEST | jreher | Updated APD location via API. |
20. Dec 2016 10:26:16 CET | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:13 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:32:21 CEST | Tobias | Imported from Hamamatsu datasheet. |