RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005294 - Archived data from Wed, 07. October 2020 15:46:05 CEST


This is all the information about APD 0617005294. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005294
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 424 V
Dark current: 14.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 45
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.9258356 V     T = -25 °C: 386.9907341 V
Voltage for Gain 150: T = +20 °C: 431.8012417 V     T = -25 °C: 394.8382839 V
Voltage for Gain 200: T = +20 °C: 436.1594466 V     T = -25 °C: 399.180008 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.486194925 V-1     T = -25 °C: 4.47872472 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.681455924 V-1     T = -25 °C: 8.668451886 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70683102 V-1     T = -25 °C: 14.70948315 V-1
Break-through voltage: T = +20 °C: 440.0019496 V     T = -25 °C: 414.3626325 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:53:59 CET jreher Updated box and position via API.
03. Feb 2021 18:19:46 CET jreher Updated box and position via API.
07. Oct 2020 15:46:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:00 CET jreher Updated APD location via API.
25. Nov 2019 17:14:29 CET jreher Updated box and position via API.
04. Jul 2019 11:11:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:37 CEST jreher Updated APD batch assignment via API.
21. Aug 2018 11:26:39 CEST markus.moritz
28. Apr 2014 15:40:36 CEST Tobias Imported from Hamamatsu datasheet.