RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1404015381 - Archived data from Fri, 05. February 2021 10:53:41 CET


This is all the information about APD 1404015381. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1404015381
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.1 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 42
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 369
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 393.3282432 V     T = -25 °C: 357.0864868 V
Voltage for Gain 150: T = +20 °C: 401.3266427 V     T = -25 °C: 364.8205908 V
Voltage for Gain 200: T = +20 °C: 405.8325378 V     T = -25 °C: 369.1771671 V
Gain/Voltage slope at M = 100: T = +20 °C: 5.014595828 V-1     T = -25 °C: 4.3616564 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.045624882 V-1     T = -25 °C: 9.211223328 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79772036 V-1     T = -25 °C: 13.94984912 V-1
Break-through voltage: T = +20 °C: 421.7586995 V     T = -25 °C: 385.195682 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:50 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:52 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:53:41 CET jreher Updated box and position via API.
03. Feb 2021 18:19:28 CET jreher Updated box and position via API.
11. Aug 2020 17:26:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:29 CET jreher Updated APD location via API.
25. Nov 2019 17:14:17 CET jreher Updated box and position via API.
04. Jul 2019 11:11:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:31 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 14:36:58 CET markus.moritz
29. Sep 2017 13:34:43 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:11 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:22 CEST Tobias Imported from Hamamatsu datasheet.