Show Hamamatsu Avalanche Photo Diode 1404015362 - Archived data from Tue, 11. August 2020 17:24:58 CEST
This is all the information about APD 1404015362. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1404015362 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D11 |
Break-through voltage: | 422 V |
Voltage for Gain 100 (T=+25°C): | 393.3 V |
Dark current: | 6.3 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 33 |
Position in Box: | 1 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 369 |
Position in grid: | 2 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 26. Nov 2018 |
Return for assembly: | none |
Irradiation: | |
Date: | 22. Nov 2018 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 23. Nov 2018 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 394.2626824 V T = -25 °C: 357.6258035 V |
Voltage for Gain 150: | T = +20 °C: 402.1767012 V T = -25 °C: 365.3129196 V |
Voltage for Gain 200: | T = +20 °C: 406.5641089 V T = -25 °C: 369.6335382 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.312417077 V-1 T = -25 °C: 4.576908159 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.293959288 V-1 T = -25 °C: 8.596730247 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.92259657 V-1 T = -25 °C: 14.48025872 V-1 |
Break-through voltage: | T = +20 °C: 421.6608683 V T = -25 °C: 384.9834712 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
15. Nov 2022 13:16:53 CET | oafedulidis | Assigned to capsule by script |
16. Dec 2021 13:41:16 CET | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:52:04 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:18:10 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:24:58 CEST | jreher | Updated APD characteristics via API. |
28. Nov 2019 12:22:24 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:13:27 CET | jreher | Updated box and position via API. |
13. Jun 2019 11:29:00 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:47:50 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:32:45 CEST | jreher | Updated APD batch assignment via API. |
26. Nov 2018 14:45:34 CET | markus.moritz | |
29. Sep 2017 13:34:43 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:11 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:31:22 CEST | Tobias | Imported from Hamamatsu datasheet. |