RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1404015358 - Archived data from Fri, 16. April 2021 22:01:03 CEST


This is all the information about APD 1404015358. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1404015358
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 394.9 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 368
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 394.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.41925 V     T = -25 °C: 358.1856423 V
Voltage for Gain 150: T = +20 °C: 402.3988533 V     T = -25 °C: 365.8962176 V
Voltage for Gain 200: T = +20 °C: 406.8150248 V     T = -25 °C: 370.2358926 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.376951359 V-1     T = -25 °C: 4.651655513 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.500688154 V-1     T = -25 °C: 9.150769042 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63203445 V-1     T = -25 °C: 14.13952025 V-1
Break-through voltage: T = +20 °C: 422.094014 V     T = -25 °C: 385.4871291 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:20 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:03 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:03 CET jreher Updated box and position via API.
08. Oct 2020 18:15:33 CEST jreher Updated APD location via API.
17. Sep 2020 14:26:28 CEST vwerner Updated APD batch assignment via API.
17. Aug 2020 14:32:03 CEST vwerner Updated APD batch assignment via API.
03. Nov 2017 16:13:11 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:27 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:08:48 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:11 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:21 CEST Tobias Imported from Hamamatsu datasheet.