RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1404015355 - Archived data from Mon, 01. August 2016 17:29:11 CEST


This is all the information about APD 1404015355. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1404015355
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.9 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 368
Position in grid: 17
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:04 CET jreher Updated box and position via API.
11. Aug 2020 17:58:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:30 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:44 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:45 CET jreher Updated box and position via API.
03. Nov 2017 16:13:11 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:27 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:08:48 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:11 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:21 CEST Tobias Imported from Hamamatsu datasheet.