RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1404015355 - Archived data from Tue, 11. August 2020 17:58:22 CEST


This is all the information about APD 1404015355. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1404015355
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.9 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 368
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 394.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.6076596 V     T = -25 °C: 358.2231845 V
Voltage for Gain 150: T = +20 °C: 402.5640567 V     T = -25 °C: 365.9463533 V
Voltage for Gain 200: T = +20 °C: 406.9619772 V     T = -25 °C: 370.2783894 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.350861449 V-1     T = -25 °C: 4.649782295 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.421394695 V-1     T = -25 °C: 9.166110007 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58962042 V-1     T = -25 °C: 14.29136509 V-1
Break-through voltage: T = +20 °C: 422.69631 V     T = -25 °C: 386.0856929 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:04 CET jreher Updated box and position via API.
11. Aug 2020 17:58:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:30 CEST jreher Updated box and position via API.
19. Dec 2019 16:35:44 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:45 CET jreher Updated box and position via API.
03. Nov 2017 16:13:11 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:27 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:08:48 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:11 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:21 CEST Tobias Imported from Hamamatsu datasheet.