RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1403015270 - Archived data from Fri, 05. February 2021 11:28:05 CET


This is all the information about APD 1403015270. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1403015270
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 14.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 364
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 389.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.4780598 V     T = -25 °C: 353.2659682 V
Voltage for Gain 150: T = +20 °C: 397.4854916 V     T = -25 °C: 360.8266474 V
Voltage for Gain 200: T = +20 °C: 401.9227148 V     T = -25 °C: 365.0756745 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391880839 V-1     T = -25 °C: 4.727388544 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.442996796 V-1     T = -25 °C: 9.43203357 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49224161 V-1     T = -25 °C: 14.84643758 V-1
Break-through voltage: T = +20 °C: 416.6403106 V     T = -25 °C: 379.7745028 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:23:42 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:29:50 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:05 CET jreher Updated box and position via API.
11. Aug 2020 17:58:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:31 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:51 CET jreher Updated APD location via API.
19. Dec 2019 15:18:46 CET jreher Updated box and position via API.
27. Oct 2017 10:38:08 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:27:44 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:17:01 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:08 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:19 CEST Tobias Imported from Hamamatsu datasheet.