Show Hamamatsu Avalanche Photo Diode 1403015254 - Archived data from Tue, 11. August 2020 17:58:22 CEST
This is all the information about APD 1403015254. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1403015254 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E14 |
Break-through voltage: | 420 V |
Voltage for Gain 100 (T=+25°C): | 391.9 V |
Dark current: | 11 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 307 |
Position in Box: | 24 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 364 |
Position in grid: | 1 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 27. Oct 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 25. Oct 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 3 |
Bias voltage: | 391.9 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 392.2587657 V T = -25 °C: 355.7627382 V |
Voltage for Gain 150: | T = +20 °C: 400.2182041 V T = -25 °C: 363.41347 V |
Voltage for Gain 200: | T = +20 °C: 404.6390614 V T = -25 °C: 367.7077591 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.450348709 V-1 T = -25 °C: 4.855198857 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.668562928 V-1 T = -25 °C: 8.7345864 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.01769197 V-1 T = -25 °C: 15.23094018 V-1 |
Break-through voltage: | T = +20 °C: 420.0291928 V T = -25 °C: 383.216107 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:28:04 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:58:22 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:44:40 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:44:30 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:35:44 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:45 CET | jreher | Updated box and position via API. |
27. Oct 2017 10:38:08 CEST | markus.moritz | Entered shipped after irradiation date. |
26. Oct 2017 16:27:44 CEST | markus.moritz | Entered irradiation information. |
29. Sep 2017 12:17:00 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:07 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:31:19 CEST | Tobias | Imported from Hamamatsu datasheet. |