RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1402015231 - Archived data from Tue, 11. August 2020 17:58:25 CEST


This is all the information about APD 1402015231. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1402015231
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 427 V
Voltage for Gain 100 (T=+25°C): 398.4 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 307
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 363
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 398.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 399.1770322 V     T = -25 °C: 362.4724957 V
Voltage for Gain 150: T = +20 °C: 407.0613113 V     T = -25 °C: 370.1799614 V
Voltage for Gain 200: T = +20 °C: 411.4332495 V     T = -25 °C: 374.4869988 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.52663341 V-1     T = -25 °C: 4.538815768 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.901716061 V-1     T = -25 °C: 8.941947283 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.69196953 V-1     T = -25 °C: 15.7203428 V-1
Break-through voltage: T = +20 °C: 426.9415279 V     T = -25 °C: 390.1606187 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:06 CET jreher Updated box and position via API.
11. Aug 2020 17:58:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:32 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:47 CET jreher Updated box and position via API.
03. Nov 2017 16:13:01 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:09 CEST markus.moritz Entered irradiation information.
29. Sep 2017 11:34:21 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:06 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:18 CEST Tobias Imported from Hamamatsu datasheet.