Show Hamamatsu Avalanche Photo Diode 1402015231 - Archived data from Tue, 11. August 2020 17:58:25 CEST
This is all the information about APD 1402015231. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1402015231 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D13 |
Break-through voltage: | 427 V |
Voltage for Gain 100 (T=+25°C): | 398.4 V |
Dark current: | 8.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 307 |
Position in Box: | 41 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 363 |
Position in grid: | 0 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 03. Nov 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 26. Oct 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 2 |
Bias voltage: | 398.4 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 399.1770322 V T = -25 °C: 362.4724957 V |
Voltage for Gain 150: | T = +20 °C: 407.0613113 V T = -25 °C: 370.1799614 V |
Voltage for Gain 200: | T = +20 °C: 411.4332495 V T = -25 °C: 374.4869988 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.52663341 V-1 T = -25 °C: 4.538815768 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.901716061 V-1 T = -25 °C: 8.941947283 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.69196953 V-1 T = -25 °C: 15.7203428 V-1 |
Break-through voltage: | T = +20 °C: 426.9415279 V T = -25 °C: 390.1606187 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:28:06 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:58:25 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:44:42 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:44:32 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:36:07 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:47 CET | jreher | Updated box and position via API. |
03. Nov 2017 16:13:01 CET | markus.moritz | Entered shipped after irradiation date. |
26. Oct 2017 16:36:09 CEST | markus.moritz | Entered irradiation information. |
29. Sep 2017 11:34:21 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:06 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:31:18 CEST | Tobias | Imported from Hamamatsu datasheet. |