RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1402015216 - Archived data from Tue, 11. August 2020 18:04:01 CEST


This is all the information about APD 1402015216. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1402015216
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.5 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 285
Position in Box: 15
EP1 batch: 203
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 362
Position in grid: 5
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.6197312 V     T = -25 °C: 358.4411387 V
Voltage for Gain 150: T = +20 °C: 402.585184 V     T = -25 °C: 365.97498 V
Voltage for Gain 200: T = +20 °C: 406.9950146 V     T = -25 °C: 370.2204358 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.627108718 V-1     T = -25 °C: 4.640410584 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.10117074 V-1     T = -25 °C: 9.516378223 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1238864 V-1     T = -25 °C: 14.45970409 V-1
Break-through voltage: T = +20 °C: 422.6338544 V     T = -25 °C: 385.6401478 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:04 CET jreher Updated box and position via API.
11. Aug 2020 18:04:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:52 CEST jreher Updated APD location via API.
21. Jul 2020 14:39:42 CEST jreher Updated box and position via API.
10. Feb 2020 18:57:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:14 CET jreher Updated APD location via API.
27. Nov 2019 20:17:58 CET jreher Updated APD location via API.
25. Nov 2019 17:31:04 CET jreher Updated box and position via API.
22. Oct 2019 13:10:53 CEST spankonin Updated APD location via API.
09. Oct 2019 11:44:02 CEST jgrochowski Updated APD batch assignment via API.
29. Sep 2017 11:16:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:06 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:18 CEST Tobias Imported from Hamamatsu datasheet.