RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1401015159 - Archived data from Thu, 19. December 2019 16:36:31 CET


This is all the information about APD 1401015159. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1401015159
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.4 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 308
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 359
Position in grid: 13
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 03. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 393.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:12 CET jreher Updated box and position via API.
11. Aug 2020 17:58:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:55 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:46 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:31 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:54 CET jreher Updated box and position via API.
03. Nov 2017 16:15:16 CET markus.moritz Entered shipped after irradiation date.
03. Nov 2017 16:14:32 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:18:22 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:04 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:16 CEST Tobias Imported from Hamamatsu datasheet.