RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1401015140 - Archived data from Thu, 15. October 2020 12:47:18 CEST


This is all the information about APD 1401015140. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1401015140
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 395.4 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 381
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 358
Position in grid: 14
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 20. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 395.4 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:03:13 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:37:11 CET jreher Updated box and position via API.
15. Oct 2020 12:47:18 CEST vwerner Updated APD batch assignment via API.
08. Oct 2020 18:20:09 CEST jreher Updated APD location via API.
20. Oct 2017 14:31:38 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:50:32 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:21:34 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:03 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:16 CEST Tobias Imported from Hamamatsu datasheet.