RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1320015070 - Archived data from Tue, 11. August 2020 17:25:29 CEST


This is all the information about APD 1320015070. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1320015070
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 447 V
Voltage for Gain 100 (T=+25°C): 419.3 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 36
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 355
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.2273923 V     T = -25 °C: 383.619162 V
Voltage for Gain 150: T = +20 °C: 428.1765926 V     T = -25 °C: 391.5529042 V
Voltage for Gain 200: T = +20 °C: 432.5795419 V     T = -25 °C: 395.9448044 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.393116212 V-1     T = -25 °C: 4.490322395 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.999974929 V-1     T = -25 °C: 9.342763458 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3613347 V-1     T = -25 °C: 14.93137464 V-1
Break-through voltage: T = +20 °C: 439.8829406 V     T = -25 °C: 410.4577579 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:39 CET jreher Updated box and position via API.
03. Feb 2021 18:18:34 CET jreher Updated box and position via API.
11. Aug 2020 17:25:29 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:59 CET jreher Updated APD location via API.
25. Nov 2019 17:13:42 CET jreher Updated box and position via API.
13. Jun 2019 11:29:41 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:59 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:30:45 CET markus.moritz
29. Sep 2017 11:18:40 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:01 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:14 CEST Tobias Imported from Hamamatsu datasheet.