RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1320015061 - Archived data from Tue, 11. August 2020 17:58:36 CEST


This is all the information about APD 1320015061. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1320015061
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.1 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 308
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 354
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 414.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.97746 V     T = -25 °C: 378.9737807 V
Voltage for Gain 150: T = +20 °C: 423.9906668 V     T = -25 °C: 386.9495216 V
Voltage for Gain 200: T = +20 °C: 428.4597498 V     T = -25 °C: 391.4024881 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.548843297 V-1     T = -25 °C: 4.683956098 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.914721317 V-1     T = -25 °C: 8.493957016 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.69242073 V-1     T = -25 °C: 13.9272596 V-1
Break-through voltage: T = +20 °C: 439.9832063 V     T = -25 °C: 406.9418369 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:14 CET jreher Updated box and position via API.
11. Aug 2020 17:58:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:47 CEST jreher Updated box and position via API.
19. Dec 2019 16:47:33 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:55 CET jreher Updated box and position via API.
20. Oct 2017 14:31:31 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:54:57 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:01:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:01 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:14 CEST Tobias Imported from Hamamatsu datasheet.