RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1320015046 - Archived data from Tue, 11. August 2020 17:58:35 CEST


This is all the information about APD 1320015046. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1320015046
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 419.9 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 308
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 354
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 419.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 421.1598267 V     T = -25 °C: 384.670697 V
Voltage for Gain 150: T = +20 °C: 429.0796226 V     T = -25 °C: 392.5176836 V
Voltage for Gain 200: T = +20 °C: 433.4777011 V     T = -25 °C: 396.8502483 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482532931 V-1     T = -25 °C: 4.38221007 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.901164961 V-1     T = -25 °C: 8.586889878 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83316489 V-1     T = -25 °C: 15.08442543 V-1
Break-through voltage: T = +20 °C: 439.9780123 V     T = -25 °C: 411.593531 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:14 CET jreher Updated box and position via API.
11. Aug 2020 17:58:35 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:47 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:32 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:55 CET jreher Updated box and position via API.
20. Oct 2017 14:31:31 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:54:57 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:01:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:00 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:14 CEST Tobias Imported from Hamamatsu datasheet.