Show Hamamatsu Avalanche Photo Diode 1320015043 - Archived data from Tue, 11. August 2020 17:58:34 CEST
This is all the information about APD 1320015043. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1320015043 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B12 |
Break-through voltage: | 452 V |
Voltage for Gain 100 (T=+25°C): | 423.4 V |
Dark current: | 10.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 308 |
Position in Box: | 37 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 354 |
Position in grid: | 3 |
Arrival for irradiation: | 29. Sep 2017 |
Sent for analysis after irradiation: | 20. Oct 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 19. Oct 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 4 |
Bias voltage: | 423.4 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 424.1300676 V T = -25 °C: 387.514333 V |
Voltage for Gain 150: | T = +20 °C: 432.0423159 V T = -25 °C: 395.3752218 V |
Voltage for Gain 200: | T = +20 °C: 436.4419867 V T = -25 °C: 399.7234949 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.533273145 V-1 T = -25 °C: 4.422525731 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.910998898 V-1 T = -25 °C: 8.6748854 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 13.79253498 V-1 T = -25 °C: 15.20788543 V-1 |
Break-through voltage: | T = +20 °C: 440.0067602 V T = -25 °C: 414.9945788 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:28:13 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:58:34 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:44:56 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:44:46 CEST | jreher | Updated box and position via API. |
19. Dec 2019 16:36:32 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:18:54 CET | jreher | Updated box and position via API. |
20. Oct 2017 14:31:31 CEST | markus.moritz | Entered shipped after irradiation date. |
20. Oct 2017 09:54:56 CEST | markus.moritz | Entered irradiation information. |
29. Sep 2017 12:01:54 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:29:00 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
23. Jun 2016 10:31:13 CEST | Tobias | Imported from Hamamatsu datasheet. |