RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1320015043 - Archived data from Tue, 11. August 2020 17:58:34 CEST


This is all the information about APD 1320015043. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1320015043
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 423.4 V
Dark current: 10.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 308
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 354
Position in grid: 3
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 20. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 19. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 423.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.1300676 V     T = -25 °C: 387.514333 V
Voltage for Gain 150: T = +20 °C: 432.0423159 V     T = -25 °C: 395.3752218 V
Voltage for Gain 200: T = +20 °C: 436.4419867 V     T = -25 °C: 399.7234949 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533273145 V-1     T = -25 °C: 4.422525731 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.910998898 V-1     T = -25 °C: 8.6748854 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.79253498 V-1     T = -25 °C: 15.20788543 V-1
Break-through voltage: T = +20 °C: 440.0067602 V     T = -25 °C: 414.9945788 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:13 CET jreher Updated box and position via API.
11. Aug 2020 17:58:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:46 CEST jreher Updated box and position via API.
19. Dec 2019 16:36:32 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:54 CET jreher Updated box and position via API.
20. Oct 2017 14:31:31 CEST markus.moritz Entered shipped after irradiation date.
20. Oct 2017 09:54:56 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:01:54 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:00 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:31:13 CEST Tobias Imported from Hamamatsu datasheet.