RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1319014931 - Archived data from Wed, 07. October 2020 15:45:58 CEST


This is all the information about APD 1319014931. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1319014931
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 416.3 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 349
Position in grid: 11
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.1381657 V     T = -25 °C: 379.7119734 V
Voltage for Gain 150: T = +20 °C: 424.1503644 V     T = -25 °C: 387.6743032 V
Voltage for Gain 200: T = +20 °C: 428.6074823 V     T = -25 °C: 392.0833552 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.756224173 V-1     T = -25 °C: 4.125608886 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.406518974 V-1     T = -25 °C: 8.238318611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.91624233 V-1     T = -25 °C: 15.64290806 V-1
Break-through voltage: T = +20 °C: 439.8891236 V     T = -25 °C: 407.4940532 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:35 CET jreher Updated box and position via API.
03. Feb 2021 18:18:31 CET jreher Updated box and position via API.
07. Oct 2020 15:45:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:27 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:50 CET jreher Updated APD location via API.
25. Nov 2019 17:13:40 CET jreher Updated box and position via API.
13. Jun 2019 11:29:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:58 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:25:19 CET markus.moritz
29. Sep 2017 11:21:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:57 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:49 CEST Tobias Imported from Hamamatsu datasheet.