RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1319014925 - Archived data from Mon, 01. August 2016 17:28:57 CEST


This is all the information about APD 1319014925. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1319014925
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 413.8 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 349
Position in grid: 6
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:34 CET jreher Updated box and position via API.
03. Feb 2021 18:18:30 CET jreher Updated box and position via API.
07. Oct 2020 15:45:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:26 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:50 CET jreher Updated APD location via API.
25. Nov 2019 17:13:39 CET jreher Updated box and position via API.
13. Jun 2019 11:29:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:57 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:24:11 CET markus.moritz
29. Sep 2017 11:21:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:57 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:49 CEST Tobias Imported from Hamamatsu datasheet.