RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014920 - Archived data from Tue, 11. August 2020 17:25:25 CEST


This is all the information about APD 1318014920. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014920
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C15
Break-through voltage: 442 V
Voltage for Gain 100 (T=+25°C): 416.8 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 349
Position in grid: 1
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.0504372 V     T = -25 °C: 379.2028724 V
Voltage for Gain 150: T = +20 °C: 424.0779563 V     T = -25 °C: 387.1039746 V
Voltage for Gain 200: T = +20 °C: 428.4512203 V     T = -25 °C: 391.5297725 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.489745547 V-1     T = -25 °C: 4.909201783 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.487833857 V-1     T = -25 °C: 9.016779193 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59404594 V-1     T = -25 °C: 13.90832893 V-1
Break-through voltage: T = +20 °C: 439.443102 V     T = -25 °C: 405.1389205 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:32 CET jreher Updated box and position via API.
03. Feb 2021 18:18:29 CET jreher Updated box and position via API.
07. Oct 2020 15:45:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:25 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:49 CET jreher Updated APD location via API.
25. Nov 2019 17:13:39 CET jreher Updated box and position via API.
13. Jun 2019 11:29:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:02 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:57 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 14:23:04 CET markus.moritz
29. Sep 2017 11:21:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:57 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:49 CEST Tobias Imported from Hamamatsu datasheet.