RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014902 - Archived data from Tue, 11. August 2020 17:40:41 CEST


This is all the information about APD 1318014902. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014902
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 417.8 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 348
Position in grid: 4
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 419.0060934 V     T = -25 °C: 382.5313351 V
Voltage for Gain 150: T = +20 °C: 426.9004624 V     T = -25 °C: 390.3391382 V
Voltage for Gain 200: T = +20 °C: 431.2745909 V     T = -25 °C: 394.6682734 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.563335041 V-1     T = -25 °C: 4.435661284 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.047523895 V-1     T = -25 °C: 8.739796084 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09426703 V-1     T = -25 °C: 15.29624344 V-1
Break-through voltage: T = +20 °C: 439.9893887 V     T = -25 °C: 409.4966465 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:58 CET jreher Updated box and position via API.
07. Oct 2020 15:44:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:12 CET jreher Updated APD location via API.
25. Nov 2019 17:31:37 CET jreher Updated box and position via API.
22. Oct 2019 14:33:20 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:18 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:27:27 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:56 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:58 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:20 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:56 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:49 CEST Tobias Imported from Hamamatsu datasheet.